Base load is a concept of the past, grids around the world are being redesigned to be flexible to reap zero-production-costs renewable energy. Nuclear (which is impossible to run economically as a flexible asset) simply does not fit into that new world anymore.
Base load is a concept of the past, grids around the world are being redesigned to be flexible to reap zero-production-costs renewable energy. Nuclear (which is impossible to run economically as a flexible asset) simply does not fit into that new world anymore.