It takes 15 years to build a nuclear power plant. It shouldn't take this long at all and it's strictly because of regulations. If we cut down the time it takes to build a plant the cost plummets.
Nuclear regulations are no worse than aviation regulation. Yet planes manage to be cost competitive.
Cutting regulations isn't necessary the win people think. If safety regulations are cut, it risks accidents in future.
Nuclear needs to move from bespoke builds to serial production.
But what are the specific regulations you would cut, dude?
Which regulations?
What would change in the construction process?
China builds the same designs as the EU and US, yet faster. What is different?
I saw toooooooons of reports of construction mishaps in the US at Vogtle and Summer. I didn't see anything about "oh if we changed this sort of regulation it would have saved us money."
It's a very worthwhile to read the retrospectives on these builds. There are lots of plans of future builds of the AP1000 that would be cheaper, but none of the plans even indicate that a regulation change would help.
I beg of people who say regulations are in the way: which regulations? Concretely, what should change to make construction cheaper? Pun intended.