Other than the back and forth / lead time issues on checking issues, what do you think a local manufacturer shop in the US would do better? If the takeaway was needing to specify stuff in the design phase earlier that's kind of a universal manufacturing lesson I think.
Other than the back and forth / lead time issues on checking issues, what do you think a local manufacturer shop in the US would do better? If the takeaway was needing to specify stuff in the design phase earlier that's kind of a universal manufacturing lesson I think.