I thought cooling was pretty much pre-planned in any data center, and you simply don't install more stuff than you can cool?

So did some cooling equipment fail here or was there an external reason for the overheating? Or does Amazon overbook the cooling in their data centers?


Replies

AdamJacobMulleryesterday at 10:24 PM

This is almost definitely an issue of equipment failure.

Cooling in datacenters is like everything else both over and under provisioned.

It's overprovisioned in the sense that the big heat exchange units are N+1 (or in very critical and smaller load facilities 2N/3N). This is done because you need to regularly take these down for maintenance work and they have a relatively high failure rate compared to traditional DC components and require mechanical repairs that require specialized labor and long lead times. In a bigger facility its not uncommon to have cooling be N+3 or more when N becomes a bigger number because you're effectively always servicing something or have something down waiting for a blower assembly which needs to be literally made by a machinist with a lathe because that part doesn't exist anymore but that's still cheaper than replacing the whole unit.

The system are also under-provisioned in the sense that if every compute capacity in the facility suddenly went from average power draw to 100% power draw you would overload the cooling capacity, you would also commonly overload things in the electrical and other paths too. Over provisioning is just the nature of the industry.

In general neither of these things poses a real problem because compute loads don't spike to 100% of capacity and when they do spike they don't spike for terribly long and nobody builds facilities on a knife-edge of cooling or power capacity.

The problem comes when you have the intersection of multiple events.

You designed your cooling system to handle 200% of average load which is great because you have lots of headroom for maintenance/outages.

Repair guy comes on Tuesday to do work on a unit and finds a bad bearing, has to get it from the next state over so he leaves the unit off overnight to not risk damaging the whole fan assembly (which would take weeks to fabricate).

The two adjacent cooling units are now working JUST A BIT harder to compensate and one of them also had a motor which was just slightly imbalanced or a fuse which was loose and warming up a bit and now with an increased duty cycle that thing which worked fine for years goes pop.

Now you're minus two units in an N+2 facility. Not really terrible, remember you designed for 200% of average load.

That 3rd unit on the other side of the first failed unit, now under way more load, also has a fault. You're now minus 3 in a N+2 facility.

Still, not catastrophic because really you designed for 200% of average load.

The thing is, it's now 4AM, the onsite ops guy can't fix these faults and needs to call the vendor who doesn't wake up till 7AM and won't be onsite till 9.

Your load starts ramping up.

Everything up above happens daily in some datacenter in the USA. It happens in every datacenter probably once a year.

What happens next is the confluence of events which puts you in the news.

One of your bigger customers decides now is a great time to start a huge batch processing job. Some fintech wants to run a huge model before market open or some oil firm wants to do some quick analysis of a new field.

They spin up 10000 new VMs.

Normally, this is fine, you have the spare capacity.

But, remember, you planned for 200% of AVERAGE cooling capacity and this is not nodes which are busy but not terribly busy, these are nodes doing intense optimized number crunching work which means they draw max power and thus expel max waste heat.

Not only has your load in terms of aggregate number of machines spiked but their waste heat impact is also greater on average.

Boom, cascading failure, your cooling is now N-4.

Server fans start ramping up faster which consumes more power.

Your cooling is now N-5.

Alarms are blaring all over the place.

Safeties on the cooling units start to trip as they exceed their load and refrigerant pressures rise.

Your cooling is now N-6.

Your cooling is now N-7.

Your cooling is now 0.

show 7 replies
DevelopingElkyesterday at 10:07 PM

One of the data center's cooling loops broke.

show 1 reply
Andystoday at 2:40 AM

I worked in a DC that had multiple redundant chillers on the roof, and multiple redundant coolers on each floor, but the whole building's cooling failed at once when the water lines failed somehow.

They didn't say how, but apparently the pipes between each floor and the roof were not redundant. It took almost 24 hours to fix.

el_benhameentoday at 4:09 AM

Good listen on similar topics here: https://signalsandthreads.com/the-thermodynamics-of-trading/