Havoctoday at 8:07 PM1 replyview on HN

It's kinda crazy that data centers aren't on some sort of ringfenced scheme.

This whole just throw it on the grid and residential consumers pick up the increased infra costs is insane


Replies

dmixtoday at 8:46 PM

> and residential consumers pick up the increased infra costs is insane

These companies are investing heavily in new energy development?

https://techcrunch.com/2025/03/30/data-centers-love-solar-he...

> Meta kicked off the year with a 200-megawatt solar deal with multinational electric utility Engie. The purchase went toward a solar farm near one of the company’s existing data centers in Texas. At the time of the deal, Meta already had over 12 gigawatts of generating capacity in its renewable portfolio.

> Stargate AI partnership between OpenAI, Oracle, and SoftBank Group was reported by Bloomberg to be powered, at least in part, by solar. SB Energy, which is part of SoftBank’s portfolio, is expected to develop solar installations backed by grid-scale batteries.

> Meta closed out the month with another massive solar deal, this one with Spanish renewable developer Zelestra. The contract was for 595 megawatts of capacity.

> Meta continued its streak in February, investing in a 505-megawatt solar project with Cypress Creek Renewables, which is developing the massive installation in Coleman County, Texas — about 150 miles northwest of Austin.

> Microsoft entered the fray in February, too. The company has long been a buyer of renewable energy to power its operations, and added another 389 megawatts of solar in a deal with EDP Renewables North America.

> Amazon also made a big purchase, backing a hybrid project on the Iberian Peninsula that includes wind, solar, and pumped-hydroelectric storage. The deal included 476 megawatts total, of which 212 megawatts are solar.

> Outside of the U.S., data center operators have also been investing in solar. In India, CtrlS built its own 125-megawatt facility in two phases, the first half of which was finished in June 2024 with the second completed in early February. In South America, Telecom Argentina agreed to buy electricity from a 130-megawatt solar farm developed by MSU Green Energy.

> Microsoft added another three solar developments in March, again focusing on the Midwest. The projects span Illinois, Michigan, and Missouri, and they’re being developed by AES. Together, they will provide Microsoft with 475 megawatts of capacity, adding to its considerable 34-gigawatt portfolio.

> Cisco got in the game with a 100-megawatt deal with X-Elio, a solar developer owned by Brookfield, an asset manager that has bet big on renewables. The power purchase agreements see Cisco buying capacity from two different Texas solar projects.

> Meta added another 200 megawatts of solar to its portfolio in March in a deal with RWE. The solar farm will be built just southeast of Austin.

> In Italy, data center operator Data4 signed a 10-year deal with utility Edison Energia to buy power from a 148-megawatt solar farm northwest of Rome.

That was all in 2025^

There's also been big investment in nuclear and natural gas

https://www.bbc.com/news/articles/c748gn94k95o