I've found Fable 5 to be so much better than 4.8.
For building a full stack custom CRM and media pipeline tool with video conversion, transcription, and indexing. Supabase, AWS, Meili, NextJS, GCS - lots of surfaces and planes.
4.8 basically couldn't do it, I abandoned the project as the fallback was, "current business processes".
With F5 it's been 4 weeks and almost ready for production release.
I have the same quality results with Fable. With just a brief prompt, it created a great static website with a beautiful animation of a workflow. Gemini's output was so poor that I closed the chat. And with Codex, the results were bad, so I discarded them.