Not quite. It was already starting, but the Federal government at the time was very anti RE.
South Australia had a single interconnect to the rest of the Australian Energy Market that covers the states except for WA and Northern Territory.
There was a big storm that took out an interstate interconnect and the voltage spike caused all the other generators to disconnect to protect themselves.
Then Elon promised to build utility storage in 6 months or the state would get it for free.
That was the Hornsby battery which is mainly used for Frequency services (basically when supply/demand fluctuates, it keeps things stable).
That used to be done by gas plants, but the battery saved a large chunk of its cost in the first year by being able to switch on much faster.
Not quite. It was already starting, but the Federal government at the time was very anti RE.
South Australia had a single interconnect to the rest of the Australian Energy Market that covers the states except for WA and Northern Territory.
There was a big storm that took out an interstate interconnect and the voltage spike caused all the other generators to disconnect to protect themselves.
Then Elon promised to build utility storage in 6 months or the state would get it for free.
That was the Hornsby battery which is mainly used for Frequency services (basically when supply/demand fluctuates, it keeps things stable).
That used to be done by gas plants, but the battery saved a large chunk of its cost in the first year by being able to switch on much faster.