tapeout could shrink but days per mask layer (DPML) does not have much margin..
I'm not in industry, is DPML (which I assume is the time required to make a mask?) set by electron beam scan time or something?
I'm not in industry, is DPML (which I assume is the time required to make a mask?) set by electron beam scan time or something?