> Their design appears to have it roots in the (false) idea that what was holding back nuclear was perception of safety, rather than cost.

And why do you think they cost so much? Because people need to believe they are safe from catastrophic failure


Replies

derrizyesterday at 9:56 PM

Large scale civil engineering projects will always cost more than simply installing stuff that comes almost fully assembled from a factory (solar, wind, battery or small/medium gas turbines). Opex will always be much higher for a generation facility which requires 850 FTE specialist employees to operate (US average per plant) compared to the minimal requirements for on-site employees for utility scale solar or wind facilities. Generation tech which requires no fuel or hazardous waste handling and storage also has an obvious cost advantage. None of these factors have anything to do with “need to believe”.