If I did the math right, Seattle-area Federal Way Link Extension costs $185k per yard, getting 81 yards for $15M.
God we're terrible at building things.
Don't forget the decades of time it takes to build the tracks.
Is that the California high speed rail I see trying to hide in the back?
Don't forget the decades of time it takes to build the tracks.