logoalt Hacker News

A new world airport and its baggage

64 points • by firloop • last Wednesday at 10:30 PM • 4 comments • view on HN

Comments

jebarker • today at 2:44 PM

> This year, the airport announced plans to remove the last of the Telecar equipment from the connecting tunnel and refit the space it used to occupy as a pedestrian walkway. The $300-700 million project is scheduled to start early next year

Must be a fancy pedestrian walkway! Also amazing that somehow they can’t estimate the cost to within less than a $400 million difference

z3ugma • today at 1:15 PM

I appreciate both the level of detail and the storytelling. This looks to have been a lot of work and care.

Animats • today at 8:17 AM

Today, such systems just work.[1] 25mph carts are now normal.

This is more of a construction management problem. Two vendors went bankrupt and coordination between the tunnel construction and baggage system was terrible. I've seen pictures of that project showing where concrete footings for conveyors didn't line up across a contractor boundary. This was not primarily a software problem.

[1] https://www.youtube.com/watch?v=h0_4Xp_XkQ4

jibcage • today at 7:08 AM

[flagged]