Honestly I don't agree with this. A few reasons why I feel like I will always want a plan mode:
1. I want to know whats going to happen, at least at a high level, before changes are actually made. 2. Plan mode helps me flesh out the missing details of my plan before being mid-execution 3. In situations where I have a limited budget for AI usage I will often times use a high powered model like Opus 5.5 or Fable to make a detailed plan, then scale down to a cheaper model for implementation. I feel like this saves cost in the end.
I get plan mode is basically just a small hidden prompt. I get that I can basically just preface my prompts with "make a plan only, don't make actual changes." Maybe this is just a UX trick, but it works well for my brain.