Shipping one abi3 wheel instead of per version builds cut our CI matrix from like 20 jobs to 4, that alone was worth it.
Do you mean way back when abi3 became useable?
Because currently abi3t is only relevant for 3.15, its value is future-proofing artefacts for 3.16 and beyond, you need two free threaded wheels at least (3.14t and abi3t).
Do you mean way back when abi3 became useable?
Because currently abi3t is only relevant for 3.15, its value is future-proofing artefacts for 3.16 and beyond, you need two free threaded wheels at least (3.14t and abi3t).