Much of what you post is only partially correct. It isn’t wrong, just incomplete.
If solar and wind are as cheap as all of your citations suggest, why are data centres still reliant on the power grid and even literal gas turbines?
The surest sign that your studies and links are only partially correct are the actions of the capitalists. How many data centres can you name that use wind turbine and solar panels instead of a grid connection? These are the precise folks who would jump at the opportunity to ditch the constrains of the power grid. Even better, building power generation near data centres avoids the transmission losses as well.
The reality is that electricity is complex because it depends on time and space, where electricity is available as well as when.
Also, how many industrialised economies can you name that are supplying increased electrical demand with only renewables and batteries? Yes, not replacing, growing demand.
To be clear, most of what you post is true, just not a fair representation of the constraints of reality.
The World Crossed a Major Solar Milestone [3TW cumulative installed capacity] - https://news.ycombinator.com/item?id=49151977 - August 2026
- The world has reached the 3-terawatt threshold of solar power, with the first terawatt taking 10 years to deploy and the next two terawatts taking less than five years.
- Forecasters expect the world to deploy more than 9 terawatts of solar by 2036, with poor countries' share of solar deployment expected to start growing again from this year onward.
- The main constraint for developing countries to adopt solar power is the lack of accessible financing, and the growth of solar power is also limited by the need for energy storage, such as lithium-ion batteries, to absorb excess power.
Global energy demand growth was met by diverse range of sources in 2025, led by solar and then gas - https://www.iea.org/news/global-energy-demand-growth-was-met... - April 20th, 2026
- All major fuels and technologies expanded to meet rising demand, but at very different rates. Solar PV was the single largest contributor to growth in global energy supply in 2025, accounting for more than 25% of the increase – the first time on record that a modern renewable source has led global primary energy supply growth. Natural gas took the next largest share, at 17%, reflecting its role in power generation in many countries. Overall, renewable sources and nuclear met nearly 60% of all growth in energy demand – and power generation from these sources exceeded total growth in electricity demand.
Solar power generation drives electricity generation growth over the next two years - https://www.eia.gov/todayinenergy/detail.php?id=67005 - January 16th, 2026
- In our STEO forecast, utility-scale solar is the fastest-growing source of electricity generation in the United States, increasing from 290 BkWh in 2025 to 424 BkWh by 2027. Almost 70 gigawatts (GW) of new solar generating capacity projects are scheduled to come online in 2026 and 2027, which represents a 49% increase in U.S. solar operating capacity compared with the end of 2025.
https://ourworldindata.org/grapher/installed-solar-pv-capaci...
https://ourworldindata.org/grapher/installed-global-renewabl...
Data Centers are Helping Fuel a U.S. Battery Boom - https://e360.yale.edu/digest/data-centers-battery-storage - September 2nd, 2026
- Across the U.S., tech companies have courted backlash for using polluting gas generators to power massive new data centers. But energy industry data shows that in addition to building out natural gas, firms are adding huge amounts of battery storage.
- The energy demands of data centers are so great that large projects may need approval from regulators before connecting to the power grid. But instead of waiting for that approval, tech companies keen to build the infrastructure for A.I. are often building gas generators on site. By one estimate, more than 100 gigawatts of onsite gas power, the rough equivalent of 100 large gas power plants, is planned for data centers across the U.S.
[My note: Gas turbine manufacturers have a backlog of ~7 years, as of this comment, see https://news.ycombinator.com/item?id=47493501 for details, plans are not installed gas generators]
US data centers turn to on-site solar, storage, VPPs as grid delays mount - https://www.pv-magazine.com/2026/08/06/transmission-logjams-... - August 6th, 2026
- A Reuters Events report highlights how multi-year transmission delays are forcing data center developers in the United States to deploy 56 GW of on-site generation while turning to Virtual Power Plants to unlock fast capacity.
Data centers are outgrowing the grid. Solar is filling the gap. - https://pv-magazine-usa.com/2026/05/11/data-centers-are-outg... - May 11th, 2026
- Solar’s appeal in this context is logistical. It’s one of the few generation sources that can still be built at meaningful scale on a timetable the market can actually use. The EIA projects 86 GW of new utility-scale capacity will come online in the US in 2026, with solar accounting for 43.4 GW and battery storage another 24 GW. Those aren’t technologies that data center developers are tentatively exploring – they’re what the grid is predominantly being built from right now.
Scaling clean energy and reliability in Michigan - https://blog.google/innovation-and-ai/infrastructure-and-clo... - March 17th, 2026
- Google’s data center operations will be served by 2.7 gigawatts (GW) of new resources for the grid, including solar power, advanced storage technologies and demand flexibility. This Clean Capacity Acceleration Agreement with DTE (the same structure as the Clean Transition Tariff) will bring new, clean resources online, while supporting the state’s transition away from coal-fired power. As part of our standard approach to building new data centers, Google will fully cover its electricity costs and infrastructure needs, helping to ensure that its growth protects local ratepayers and actively bolsters the long-term resilience of the state’s electricity grid.
Google to build data center in Minnesota with new solar, wind power and battery storage - https://www.cnbc.com/2026/02/24/google-to-build-data-center-... - February 24th, 2026
- Google will deploy 1,400 megawatts of wind power, 200 megawatts of solar and 300 megawatts of battery storage to the grid under the agreement with Xcel. The renewable projects will be owned by the utility. They are expected to come online in 2028 and 2029, Shea said.
> If solar and wind are as cheap as all of your citations suggest, why are data centres still reliant on the power grid and even literal gas turbines?
The grid because while solar and wind are cheap, they are not concentrated enough for a data center. You can't get enough wind/solar on your data center's land as to power it. So you will need a connection to some form of grid, even if it isn't the commercial one.
I live in city where the power company produces more power from wind than all customers purchase (they sell it elsewhere, and I assume are buying power when the wind isn't blowing). There are a lot of data centers around me because they can get in on that cheap wind power from the grid. They still have backup generators for when the grid goes down.