adolph • yesterday at 6:25 PM • 1 reply • view on HN

I don't think these figures are right. The source data is old and very coarse.

Example: Abernathy HPC campus (Fluidstack investor group; formerly TeraWulf JV) Hale County, TX · under construction · mapped at the county centroid Average regional grid mix is 16% coal, 46% gas, 0% nuclear, 37% renewable (eGRID 2023 data).

If you look at the regional grid operator's fuel mix from something like gridstatus.io [0], nuclear is about 10% and coal maxes out at less than 16%. Likewise, renewable (wind and solar) is 37% at a minimum and about 60% of the fuel mix at peak.

0. https://www.gridstatus.io/live/ercot


Replies

mbgerring • yesterday at 6:42 PM

Highly unlikely these data centers are going to get power from the grid.