I don't think these figures are right. The source data is old and very coarse.
Example: Abernathy HPC campus (Fluidstack investor group; formerly TeraWulf JV) Hale County, TX · under construction · mapped at the county centroid Average regional grid mix is 16% coal, 46% gas, 0% nuclear, 37% renewable (eGRID 2023 data).
If you look at the regional grid operator's fuel mix from something like gridstatus.io [0], nuclear is about 10% and coal maxes out at less than 16%. Likewise, renewable (wind and solar) is 37% at a minimum and about 60% of the fuel mix at peak.
Highly unlikely these data centers are going to get power from the grid.