They're using AVERT, which looks at the marginal generators that are expected to a power a new load. Basically it's the coal and gas units that aren't running at full capacity and can ramp up their output to meet new demand. The grid variation in Figure 3 basically just reflects the amount of coal capacity operating in a given grid subregion (the AVERT tool divides the country into something like 8 subregions).