The article is a good read and I agree with the author. Using LLMs, or any other tool, to get the job done is fine so long as the job is done adequately.
An unfortunate scenario I would bring up is when an engineer uses an LLM but only gets the job done 95% correctly, and then starts arguing that the last 5% doesn't really matter, or that the last 5% just isn't possible (because their favorite LLM can't one-shot it). Those sorts of engineers, IMHO, should be shown the door. They are the ones that don't care and they drag us all down.